为了回应公司的校园总体规划,这个项目搬迁了大学的运动场,这是一个变化,涉及重新配置北边和校园入口。 Hoer Schaudt设计了一个315 x 100平方英尺的田径,并设计了一个新的校园入口,以优先考虑行人,同时允许车辆周转。 该项目涉及关闭车辆接入点,大量实用性迁移和升级。 新的多孔铺路允许更好的雨水管理,轨道西面的公园区域为进入校园心脏创造了一个新的北方“门户”。
In response to the firm’s master plan for the campus, this project relocated the University’s athletic field, a change that involved reconfiguring the northern edge and entrance to the campus. Hoerr Schaudt designed a 315 x 100 square foot track and field, and designed a new campus entrance to prioritize pedestrians while allowing for vehicle turn-arounds. The project involved closing a vehicular access point, extensive utility relocation and regrading. New porous paving allows for better stormwater management and the park-like area to the west of the track creates a new northerly ‘gateway’ for entering the heart of campus.